Previous page Configuration backup and restore for failover VMS  Connecting to a Node and Configuring of an C-Werk domain Next page

You can monitor clusters in the Dashboard tab.

The following information is available:

  1. The status of all cluster servers. All cluster servers are cross-checked against a number of criteria. The status info of a server reflects the cross-check results.

    Status

    Description

    The server successfully passed all checks.

    The server did not pass some checks. The red stripe around the icon reflects the percentage of failed checks.

  2. The percentage of allocated CPU resources is calculated for all running nodes.  For example, for a node consuming 9300 standard units out of total of 12400, the percentage is: (9300/12400)*100%=75%.

    Attention!

    This parameter does not reflect the actual Server CPU load; the amount of the node related load can be either higher or lower than the displayed value.

  3. Running database servers and their statuses.

    Status

    Description

    The database server is running.

    The database server is running, some checks failed.

    The database server is stopped.

 To open the CPU server load diagram, click Show Resource.

You can filter servers by status using the Health status panel.

Status

Description

Servers that passed all checks.

Servers that did not pass some of the checks.

Servers that failed all checks.

The icon indicates the number of cluster servers in this status

  • No labels